CSEB block manufacturing process, step by step
From digging the soil to dispatching cured blocks: the eight steps of making compressed stabilised earth blocks, and what to check at each one.
Possible Machines Private Limited ·
Making CSEB is closer to food than to brick-burning: get the ingredients right, mix them well, press them firmly and let them cure. There is no kiln at any stage. Here is the full process, as it runs on our CSEB block making plants.
8
steps from soil to dispatch
~10%
cement on our typical recipes
0
kilns or firing
28 days
of moist curing
1. Dig the right soil
Strip the topsoil, which is full of roots and organic matter, and dig the subsoil below. Test it first: our guide to the best soil for CSEB covers the hand tests and the jar test.
2. Dry, crush and screen
Damp lumps don't mix evenly, so the soil is dried, crushed and screened to remove stones and hard clods. On our automatic plant a loader feeds the soil processing line.

3. Batch
Soil, stone crush and cement are measured in fixed proportions. Our recipes usually run at around 10% cement; the right figure for your soil comes from trial blocks. Batching by weight or by calibrated bins, never by eye, is what keeps every block the same strength.